Replacing old Secure LIY or LIT dual-source prepaid meters?
Secure has discontinued its LIY and LIT dual-source meters. Replace only the meters that have failed with Innologix dual-source prepaid meters, which work with the DG setup your society already has: SMPS, injector (through a soft DG signal) or partial DG.
LIY and LIT meters are discontinued, and replacing them is not a simple swap
Many Delhi NCR societies installed Secure LIY or LIT dual-source prepaid meters years ago. These models are no longer made, so failed meters cannot be replaced like for like.
What societies run into when they move to Secure's newer meters, based on the sites we survey:
- Higher cost per meterThe newer Secure meters are considerably more expensive, which adds up across hundreds of flats.
- Injector systems need rewiringThe newer Secure meters detect grid or DG supply on their own, but this does not work where an injector is installed. Societies with injector-based DG indication have to lay SMPS DG wiring to every meter to use them.
- External contactors for partial DGWhere the society gives only partial DG backup, the newer meters do not handle it on their own, and external contactors have to be added.
- All meters have to go at onceBecause the newer meters cannot work with the injector, and their software cannot manage the older meters, a society cannot replace only its failed meters. Working LIY / LIT meters have to be replaced too.
- Recharge software does not carry overThe token software for the newer Secure meters is not compatible with the older meters, so the society cannot run old and new meters on one system.
Works with the arrangement you already have
One meter platform for every common DG setup, so the replacement fits your building rather than the other way round.
| Your existing setup | Innologix dual-source meter | What it means for you |
|---|---|---|
| Working LIY / LIT meters still in service | Keep them | Replace only failed meters now. Working meters stay on the existing injector until they fail; new meters use the soft DG signal. |
| Injector-based DG indication | Soft DG signal | DG status taken once in the DG / LT room and sent to the meters by software. No DG wiring to every meter; the injector stays for your existing meters. |
| SMPS DG signal | Supported | Your existing SMPS wiring is reused as it is. |
| Partial DG backup (limited load on DG) | Built in | No external contactor per flat for DG load limiting. |
| Full DG backup | Supported | Grid and DG metered and billed at separate rates. |
| Old token / card recharge | Replaced by online recharge | Balances migrated; residents recharge by UPI, card or net banking in the app. |
From site survey to go-live
- Site surveyWe check the DG changeover panel, the type of DG signal (injector or SMPS), the backup arrangement and the meter boxes.
- Proposal & planMeter count, cost per unit and a phased plan: replace failed meters first and keep working LIY / LIT meters in service.
- Data migrationUnits, residents, tariffs and opening balances are set up in SmartCommunity before the changeover.
- Changeover & supportMeters replaced, residents onboarded to the app, then ongoing support and AMC.
More than a replacement meter
- Resident app on Android and iPhone: balance, daily grid and DG usage, bills and receipts.
- Online recharge by UPI, cards and net banking, credited automatically.
- Society dashboard with collections, consumption by source and low-balance units.
- Maintenance billing through the same balance, if the society wants it.
- Helpdesk with complaints raised in the app and escalated to our team.
Local team, local support
We are based in Sector 48, Gurugram, and serve housing societies, RWAs and facility management companies across Delhi NCR.
- Gurugram
- Noida
- Greater Noida
- Ghaziabad
- Faridabad
- Delhi
Frequently asked questions
Our society has old Secure LIY / LIT dual-source meters. Can you replace them?
Our DG indication works through an injector. How do your meters know when we are on DG?
We already have an SMPS DG signal wired to the meters. Does that work too?
We give only partial DG backup. Do we need external contactors?
What happens to residents' balances and history from the old system?
Do we have to replace all our meters at once, including the working ones?
Which areas do you cover?
Book a free site survey
Tell us how many meters you have and your DG setup. We'll confirm compatibility and send a replacement plan.
Secure, LIY and LIT are names and trademarks of their respective owner. Innologix Consulting Pvt. Ltd. is not affiliated with or endorsed by Secure Meters Ltd. The names are used only to identify the meters our solution can replace.